The scheme “Coffee Development Programme in North Eastern Region: Water Augmentation” aims to improve the productivity and quality of coffee by facilitating the creation of infrastructure for water augmentation for irrigation and wet processing of coffee.

About This Scheme

The scheme “Coffee Development Programme in North Eastern Region: Water Augmentation” is a Sub-Component of the Scheme “Integrated Coffee Development Project During the Medium Term Framework (MTF) Period: Development Support to Stakeholders” by the Coffee Board, Department of Commerce, Ministry of Commerce and Industry. This scheme aims to improve the productivity and quality of coffee by facilitating the creation of infrastructure for water augmentation for irrigation and wet processing of coffee.

Benefits

Subsidy Details

The eligible subsidy for water harvesting structures and sprinkler units is 75% of the unit cost, capped at a maximum ceiling of ₹1,25,000 for all related activities combined.

For below-ground water storage tanks, the subsidy is based on the lower value between dimension and unit cost applicable to the size of the holding.

For above-ground water storage tanks, the subsidy is based on the lower value between the actual cost or the unit cost applicable to the below-ground water tank.

Subsidy Availability

Growers can claim subsidies for water harvesting structures and irrigation equipment either simultaneously or at different times.

Unit Cost and Subsidy for Water Harvesting Structures

Size of HoldingDimension of Water Harvesting StructureTotal Unit Cost (₹)Subsidy Amount
Up to 2 Ha.30′ x 30′ x 10′ (9000 Cft.)43,000.0075% of Unit Cost
2 Ha to 4 Ha & above43′ x 43′ x 10′ (18490 Cft.)89,000.0075% of Unit Cost

Unit Cost and Subsidy for Sprinkler/Drip Unit

Size of HoldingTotal Unit Cost (₹)Subsidy Amount
Up to 1.00 Ha.60,00075% of the Unit Cost
1.00 to 2.00 Ha. & above1,20,000

75% of the Unit Cost

Eligibility Criteria

The applicant must be a tribal grower.

The applicant should not have received a subsidy for Water Augmentation during the XII plan period.

The land records must be in the beneficiary’s name.

These records should be certified by the Village Authority/State Government/Competent Authority.

Eligible Activities

Installation of the water storage tank, open well, and irrigation equipment (sprinkler/drip) to enhance production, productivity, and quality.

Location Specifications

Water storage tank construction can be above or below ground level.

Water augmentation structures must be on the estate or within its vicinity.

Application Process

Apply Offline

Procedure for Claiming Subsidy

Step 1: Submission of Required Documents

The beneficiary/applicant submits the necessary documents in the

prescribed format

after completing the relevant activity.

Step 2: Document Scrutiny and Field Inspection

The Extension Officer examines the submitted documents and conducts a field inspection. They forward the application, physical verification report, and all relevant documents to the concerned Joint Director (Extension) or Deputy Director (Extension), either recommending eligible subsidy release or rejection.

Step 3: Review and Recommendation by Joint Director / Deputy Director

The Joint Director (Extension) or Deputy Director (Extension) thoroughly scrutinizes the documents, ensuring the admissibility of the claim. They determine and approve the applicable subsidy.

Step 4: Release of Subsidy

Upon satisfying the claim’s admissibility, the Joint Director (Extension) or Deputy Director (Extension) facilitates the release of the eligible subsidy to the beneficiary through Electronic Fund Transfer (EFT).

Official Source: View on myScheme.gov.in

Benefits

Subsidy Details
The eligible subsidy for water harvesting structures and sprinkler units is 75% of the unit cost, capped at a maximum ceiling of ₹1,25,000 for all related activities combined.
For below-ground water storage tanks, the subsidy is based on the lower value between dimension and unit cost applicable to the size of the holding.
For above-ground water storage tanks, the subsidy is based on the lower value between the actual cost or the unit cost applicable to the below-ground water tank.

Subsidy Availability
Growers can claim subsidies for water harvesting structures and irrigation equipment either simultaneously or at different times.

Unit Cost and Subsidy for Water Harvesting Structures

Size of HoldingDimension of Water Harvesting StructureTotal Unit Cost (₹)Subsidy Amount
Up to 2 Ha.30' x 30' x 10' (9000 Cft.)43,000.0075% of Unit Cost
2 Ha to 4 Ha & above43' x 43' x 10' (18490 Cft.)89,000.0075% of Unit Cost

Unit Cost and Subsidy for Sprinkler/Drip Unit

Size of HoldingTotal Unit Cost (₹)Subsidy Amount
Up to 1.00 Ha. 60,000 75% of the Unit Cost
1.00 to 2.00 Ha. & above 1,20,000 75% of the Unit Cost

Application Process

Apply Offline
Procedure for Claiming Subsidy
Step 1: Submission of Required Documents
The beneficiary/applicant submits the necessary documents in the prescribed format
after completing the relevant activity.
Step 2: Document Scrutiny and Field Inspection
The Extension Officer examines the submitted documents and conducts a field inspection. They forward the application, physical verification report, and all relevant documents to the concerned Joint Director (Extension) or Deputy Director (Extension), either recommending eligible subsidy release or rejection.
Step 3: Review and Recommendation by Joint Director / Deputy Director
The Joint Director (Extension) or Deputy Director (Extension) thoroughly scrutinizes the documents, ensuring the admissibility of the claim. They determine and approve the applicable subsidy.
Step 4: Release of Subsidy
Upon satisfying the claim's admissibility, the Joint Director (Extension) or Deputy Director (Extension) facilitates the release of the eligible subsidy to the beneficiary through Electronic Fund Transfer (EFT).

Frequently Asked Questions

Scheme Details

Full NameCoffee Development Programme in North Eastern Region: Water Augmentation
Short TitleCDPNER:WA
LevelCentral
Scheme ForIndividual
MinistryMinistry Of Commerce And Industry
CategoriesAgriculture,Rural & Environment
StatesAll India
GenderAll
Age Range43 — 2 years
AreaRural
Sourcewww.myscheme.gov.in ↗
Deepika RaikwarDeepika Raikwar · 📅 15 Apr 2026
Deepika Raikwar
Written by Deepika Raikwar 2735 articles published

Deepika Raikwar is an Education Analyst and scholarship researcher who focuses on public welfare and merit-based scholarships. She simplifies complex eligibility rules, deadlines, and application processes to help common people access reliable funding opportunities worldwide.

View all posts by Deepika Raikwar →

✍️ Share Your Experience

Have you applied for this scheme? Share your experience to help others.